Factory & Industry Owners — Lock In Today's Solar Pricing Before It Rises Further
ALMM-II exemption ends on 31 December 2026. Don't wait until 2027 — secure today's solar pricing before solar project costs move higher.
What's actually driving the increase
This isn't sales pressure — it's the current state of the Indian solar supply chain.
ALMM-II cell mandate
The exemption that currently lets many commercial and industrial projects use non-domestic cells ends on 31 December 2026, tightening supply of eligible modules.
Rising input costs
Copper, aluminium, and solar glass costs have climbed through 2026, pushing up module and structure prices industry-wide.
Import duties
Basic customs duty on imported cells and modules keeps domestic and DCR-compliant panel prices firm through the rest of the year.
What waiting could cost your business
Lock in current pricing
- ✓ Today's module and system rates secured
- ✓ Priority installation slot before year-end rush
- ✓ Full PM Surya Ghar / commercial subsidy support
- ✓ Faster ROI on your investment
Pay the higher rate
- × Exposed to post-deadline price increases
- × Longer queue as more owners rush to install
- × Possible module supply delays
Based on current industry pricing trends reported across the solar sector in 2026.
Approximate commercial system cost by size
Every roof and load profile is different — these are starting reference ranges. Your free site visit gives you an exact quote.
| System size | Best for | Approx. monthly units generated | Reference price range* |
|---|---|---|---|
| 10 kW | Small workshop / retail unit | ~1,200–1,400 units | ₹4.5L – ₹5.5L |
| 25 kW Popular | Small factory / warehouse | ~3,000–3,500 units | ₹10.5L – ₹13L |
| 50 kW | Mid-size industrial unit | ~6,000–7,000 units | ₹19L – ₹23L |
| 100 kW+ | Large factory / plant | ~12,000–14,000 units | Custom quote |
*Reference ranges only, based on current 2026 turnkey installed-cost trends (₹35,000–45,000/kW depending on roof type and structure). Final pricing depends on site survey, panel type, and load requirement — get a free evaluation for your exact number.
Common questions
Frequently asked questions
Industry-wide reports show module and project costs already up 20–25% through 2026, with further pressure expected once the ALMM-II cell exemption ends on 31 December 2026. Actual impact varies by system size and component mix — your locked quote protects you regardless.
Once you accept a proposal, we lock your pricing for a limited window so you're not affected by market changes during installation.
Commercial and industrial subsidy structures differ from residential PM Surya Ghar subsidy. Our team will confirm exact eligibility and any applicable scheme during your free site evaluation.
Most commercial rooftop installations are completed within 3–4 weeks of final approval, depending on system size and site readiness.
Get your factory or industrial unit quoted today
Free site evaluation. Our team will assess your roof, load, and subsidy eligibility — and lock in today's pricing for your project.